Dual-modem Zynq SDR final implementation report

Objective and acceptance criteria

The project connects the BPSK/QPSK reference paths, the course RTL, the Zynq/AD9361 integration design and the current hardware evidence. The implementation portion is accepted when the canonical HDL suite passes, the exact integrated top-level is fully routed and all constrained timing endpoints pass.

Board-level acceptance is stricter: repeatable silicon operation and a manifest-backed external RF measurement are separate gates. The selected ExtraTiming QPSK fabric-loopback payload is timing-clean and repeats at BER=0. The external RTL-SDR baseline remains the 2026-07-07 three-session OTA series, which reached BER=0 across 90/90 bursts and 25,200 compared bits.

Architecture

reference vectors -> BPSK/QPSK RTL -> dual-modem gpreg bridge
                                      |
                                      v
PS7 + AXI + AD9361 interface -> placed-and-routed XC7Z020 design -> local bitstream
                                      |
                                      v
                         runtime board helpers -> BER / capture evidence

Evidence summary

Layer Evidence Result Qualification
Reference/model BPSK package and deterministic QPSK replay reproducible vectors, plots and metrics synthetic
RTL canonical HDL smoke suite 18/18 tests pass; BPSK/QPSK BER=0 in their deterministic tests simulation
QPSK bridge dual-modem loopback testbench 140 symbols / 280 bits, BER=0 simulation
FPGA implementation two integrated Vivado 2021.1 flows plus a strategy sweep hardware-working snapshot is fully routed; selected WNS is +0.096 ns internal-path signoff candidate
BPSK board path promoted on-chip PL result 281 compared bits, BER=0 measured single promoted result
QPSK board path Lab 11.27 fabric loopback CDC-fixed payload: 4/4 boots and 13/13 attempts; selected ExtraTiming payload: 10/10 attempts at BER=0 for 280 bits measured silicon
External RF Lab 11.28 RTL-SDR OTA QPSK OTA baseline: 3/3 sessions, 90/90 bursts, 0/25,200 bit errors, median EVM 19.04%; ExtraTiming long-run attempt was limited by RTL-SDR transport measured cross-session baseline

Integrated implementation result

The dual-modem top-level was synthesized through two flows for xc7z020clg400-2 with Vivado 2021.1. The standalone reconstruction remains useful diagnostically; the vendor snapshot is the hardware-correlated signoff candidate.

Metric Standalone recreated Vendor snapshot
LUT 13,795 27,649
FF 21,780 36,224
DSP 28 216
BRAM tiles 4.0 8.0
WNS +0.354 ns +0.096 ns
TNS 0.000 ns 0.000 ns
Failing endpoints 0 0
Routing errors 0 0

The standalone bitstream is timing-clean but produced zero TX/RX valid counts after runtime reload. The vendor-snapshot payload closes timing after the RX channel-select CDC fix and passes QPSK fabric BER. A 6-run implementation-strategy sweep selected Performance_ExtraTimingOpt, improving the canonical WNS from +0.003 ns to +0.096 ns; repeat builds or a seed sweep are still needed before treating timing robustness as fully characterized.

Reproduction

Run software and RTL checks:

python -m pytest -q
python tools/run_block5_hdl_smoke.py --no-generate
python tools/check_dataset_manifests.py
mkdocs build --strict

On Windows with Vivado 2021.1 installed, rebuild the integrated implementation and promote normalized reports:

python tools/generate_integrated_vivado_reports.py --flow standalone --build
python tools/generate_integrated_vivado_reports.py --flow snapshot --build
python tools/run_snapshot_impl_sweep.py --jobs 2
python tools/summarize_snapshot_impl_sweep.py --promote-best

To reparse a completed local implementation without rebuilding:

python tools/generate_integrated_vivado_reports.py --flow standalone
python tools/generate_integrated_vivado_reports.py --flow snapshot

Primary artifacts:

  • reports/fpga/integrated-zynq-implementation-summary.md
  • reports/fpga/integrated_zynq_raw/integrated_zynq_metrics.json
  • reports/fpga/integrated_zynq_raw/system_top_timing_summary_routed.rpt
  • reports/fpga/integrated_zynq_raw/system_top_utilization_placed.rpt
  • reports/fpga/integrated_zynq_raw/system_top_route_status.rpt
  • reports/fpga/integrated-zynq-snapshot-implementation-summary.md
  • reports/fpga/integrated-zynq-snapshot-implementation-sweep.md
  • reports/fpga/integrated_zynq_snapshot_raw/integrated_zynq_metrics.json
  • reports/hardware/qpsk-fabric-loopback-qualification-20260707.md
  • reports/hardware/qpsk-rtl-sdr-qualification-20260707.md

Engineering conclusion

The QPSK modem is proven on the real Zynq PL at BER=0. The CDC-fixed payload is repeatable across four boot sessions and 13 attempts, and the selected ExtraTiming payload repeats across 10/10 fabric attempts. FPGA timing/board correlation is closed for the internal fabric path.

The next FPGA task is to demonstrate repeat-build/seed robustness for the selected implementation. The next measurement task is a controlled cabled comparison and longer-duration statistics on a stable RTL-SDR capture backend; 0/25,200 bits across three sessions does not establish a BER floor.